WUHAN, July 16 (Xinhua) -- The Three Gorges Hydroelectric Power Station on China's Yangtze River is running at full capacity with a combined generating capacity of 22.5 million kilowatts, as the reservoir saw its water level rising after several rounds of flooding, the China Three Gorges Corporation said Thursday.
The situation along the Yangtze River has been grim since the Three Gorges Dam saw the river's first flood of the year on July 2.
At 8 a.m. Thursday, the Three Gorges reservoir saw an inflow of 31,000 cubic meters per second, with the water level reaching 155.55 meters.
The power station began to operate at full capacity from 8:30 a.m. Wednesday.
The upper reaches of the Yangtze River are forecast to see a new round of floods within the coming days.
The Three Gorges project is a multifunctional water control system, consisting of a 2,309-meter-long and 185-meter-high dam, a five-tier ship lock, and 34 hydropower turbo-generators.
- 英语文摘:Xi, Putin to witness opening of nuclear energy cooperation project via video link
- 英语文摘:China hits 400 mln vaccine doses following recent COVID-19 outbreaks
- 英语文摘:China, Italy pledge to deepen bilateral ties, advance China-EU cooperation
- 英语文摘:Chinese vice premier urges efforts to facilitate college graduate employment
- 英语文摘:Xiplomacy: Xi's civilization view offers insight into today's world